Click on the boxes in the flow-chart below to view documents from each phase of the process.
Important Notice Accessibility of Older Documents Expires After December 30, 2020
All documents published before January 1, 2020 will no longer be accessible on this website after December 30, 2020. After December 30, 2020 all older documents can be accessed through the project repositories or by direct request to California Department of Toxic Substances Control.
Groundwater Evaluation and Modeling
Type | Download | Document Name | Publish Date | Size |
---|---|---|---|---|
![]() |
Click to Download | Hexavalent Chromium Holding Time Study Results | January 4, 2008 | 86.19 KB |
![]() |
Click to Download | Addendum to Work Plan for Hydraulic Testing in Bedrock Wells | December 19, 2006 | 4.46 MB |
![]() |
Click to Download | Workplan for Hydraulic Testing in Bedrock Wells | November 10, 2006 | 1.55 MB |
![]() |
Click to Download | Groundwater Model Report, Section 4.4, Initial Hydraulic Parameter Assignments | August 18, 2006 | 242.02 KB |
![]() |
Click to Download | Groundwater Model Report, Section 2, Site Conceptual Model | August 4, 2006 | 16.1 MB |
![]() |
Click to Download | Evaluation of Sampling Frequencies of Topock GMP Monitoring Wells Using Monitoring and Remediation Optimization System (MAROS) Software | July 25, 2006 | 170.9 KB |
![]() |
Click to Download | Groundwater Model Update Report | July 29, 2005 | 12.44 MB |
![]() |
Click to Download | Numerical Groundwater Flow Model Simulation of Interim Measures Extraction | July 15, 2005 | 2.44 MB |
![]() |
Click to Download | IM2 Groundwater Elevation and Hydraulic Gradient Error Analysis | June 23, 2005 | 1.14 MB |
![]() |
Click to Download | Evaluation of Site-Wide Groundwater Data for Hydraulic Gradient Mapping | June 7, 2005 | 903.38 KB |