Approvals and Communications
Type | Download | Document Name | Publish Date | Size |
---|---|---|---|---|
![]() |
Click to Download | DTSC to PG&E – Postponement of Groundwater Remedy Construction | April 6, 2020 | 110.71 KB |
![]() |
Click to Download | DOI to PG&E – Orderly and Temporary Shutdown of the Final Groundwater Remedy Construction Field Activities during the COVID-19 Pandemic | April 1, 2020 | 138.74 KB |
![]() |
Click to Download | NOISE-2 Compliance - Request for a waiver of a sound barrier at MW-Z | January 14, 2020 | 116.1 KB |
![]() |
Click to Download | EMAIL - DTSC approval of Topock Compressor Station Soil Management Plan (SMP) | November 19, 2019 | 207.88 KB |
![]() |
Click to Download | DOI Approval Memorandum Requesting an Engineering Evaluation/ Cost Analysis at the Pacific Gas and Electric Topock Compressor Station, San Bernardino County, California | October 18, 2018 | 1.64 MB |