Others
Type | Download | Document Name | Publish Date | Size |
---|---|---|---|---|
![]() |
Click to Download | Night Work Lighting Plan - 72-hour Aquifer Test at TW-3D | June 1, 2020 | 56.54 KB |
![]() |
Click to Download | Well Decommissioning Report for Monitoring Well MW-77-46 (MW-D-46), Pacific Gas and Electric Company, Topock Compressor Station, Needles, California | June 1, 2020 | 1.15 MB |
![]() |
Click to Download | Work Variance Request #9 - Relocate MW-A to a location downgradient of IRZ-11 and convert IRZ-11 to monitoring well | April 24, 2020 | 362.37 KB |
![]() |
Click to Download | Soil Management Plan for Compressor Station Operations, PG&E Topock Compressor Station, Needles, California | November 1, 2019 | 7.23 MB |
![]() |
Click to Download | Work Variance Request #8 - Proposed Changes to Pipeline C Segment 6 Alignment | October 8, 2019 | 2.73 MB |
![]() |
Click to Download | Approval of Discharge to Land in Accordance with State Water Quality Control Order No. 2003-0003-DWQ, Pipelines G, B and J, Topock Compressor Station, Needles, California | October 4, 2019 | 1.2 MB |
![]() |
Click to Download | Work Variance Request #5 - Phase 1 Water Conditioning System | July 22, 2019 | 2.07 MB |
![]() |
Click to Download | Colorado River Basin Regional Water Quality Control Board Approval of Discharge to Land of Well Test Water in Accordance with State Water Quality Control Order No. 2003-003-DWQ, Topock Compressor Station, Southeast of Needles, California | July 2, 2019 | 3.52 MB |
![]() |
Click to Download | Work Variance Request #7 - Changes to Construction Headquarters and Soil Processing Yard Design | June 14, 2019 | 7.98 MB |
![]() |
Click to Download | Work Variance Request #6 - Pipeline F Realignment | May 22, 2019 | 10.11 MB |
![]() |
Click to Download | Work Variance Request #4 - Realignment of Pipeline C | May 14, 2019 | 2.44 MB |
![]() |
Click to Download | Work Variance Request #3 - Changes to the Construction Headquarters Design | January 4, 2019 | 2.19 MB |
![]() |
Click to Download | Work Variance Request #2 - Temporary Construction Water Line | August 29, 2018 | 5.43 MB |
![]() |
Click to Download | Work Variance Request #1 - Brine Tanks Upgrade | July 5, 2018 | 1.14 MB |