Remedial Action Work Plan

Type Download Document Name Publish Date Size
Click to Download Revised Groundwater Corrective Measure Implementation/Remedial Design (CMI/RD) Work Plan for SWMU 1/AOC 1 and AOC 10, PG&E Topock Compressor Station, Needles, California November 2, 2011 12.25 MB
Click to Download DTSC review of revised corrective measures implementation/remedial design work plan for the groundwater remediation at Pacific Gas and Electric Company (PG&E), Topock Compressor Station, Needles, California (EPA ID No. CAT080011729) October 27, 2011 39.24 KB
Click to Download DTSC Comments on the May 2011 Groundwater CMI/RD Work Plan for SWMU 1/AOC 1 and AOC 10, PG&E Topock Compressor Station, Needles, California June 17, 2011 248.35 KB
Click to Download Federal Comments on the Draft Corrective Measures Study/Feasibility Study Report for Chromium in Groundwater at the PG&E, Topock Compressor Station, Needles, California June 17, 2011 104.66 KB
Click to Download Fort Mojave Indian Tribe Comments on May 2, 2011, Document Titled, Groundwater Corrective Measure Implementation/Remedial Design Work Plan for SWMU1/AOC1 and AOC10, PG&E Topock Compressor Station, Needles, California (Document ID: PGE20110502A) June 10, 2011 215.09 KB
Click to Download Hualapai Comments on May 2011 Groundwater CMI/RD Work Plan: Design of Groundwater Remedy—An Opportunity to Prevent Further Damages to Cultural Resources near the PG&E Topock Compressor Station, Needles, California June 6, 2011 452.63 KB
Click to Download ADEQ Comments on Groundwater Corrective Measure Implementation/Remedial Design Work Plan for SWMU VAOC 1 and AOC 10, PG&E Topock Compressor Stations, Needles, California, Site Code: 506252-01 June 3, 2011 107.05 KB
Click to Download Metropolitan Water District of Southern California (Metropolitan) comments on the Draft Corrective Measures Implementation (CMl)/Remedial Design (RD) Work Plan (WP), PG&E Topock Compressor Station, Needles, California June 3, 2011 154.76 KB
Click to Download Groundwater Corrective Measures Implementation/ Remedial Design Work Plan for SWMU 1/AOC 1 and AOC 10, PG&E Topock Compressor Station, Needles, California May 2, 2011 2.49 MB

Difficulty Accessing Material?

If you have a disability and have difficulty accessing material on this site please contact us in writing, via email or via telephone and we will work with you to make the information available. Please indicate the nature of the accessibility need, your preferred format (Braille, large print, etc.), what material you are trying to access including where it's located on this site, and how to reach you if questions arise while fulfilling your request. You can direct your requests to:

 

Written Requests

The Office of Civil Rights
Department of Toxic Substances Control
P.O. Box 806
Sacramento, CA 95812-0806

Email Requests

accessibility@dtsc.ca.gov

Telephone Requests

+1 916 324-3095
 
+1 800 728-6942 - Toll Free