Click on the boxes in the flow-chart below to view documents from each phase of the process.
Important Notice Accessibility of Older Documents Expires After December 30, 2020
All documents published before January 1, 2020 will no longer be accessible on this website after December 30, 2020. After December 30, 2020 all older documents can be accessed through the project repositories or by direct request to California Department of Toxic Substances Control.
Remedial Action Work Plan
Type | Download | Document Name | Publish Date | Size |
---|---|---|---|---|
![]() |
Click to Download | Revised Groundwater Corrective Measure Implementation/Remedial Design (CMI/RD) Work Plan for SWMU 1/AOC 1 and AOC 10, PG&E Topock Compressor Station, Needles, California | November 2, 2011 | 12.25 MB |
![]() |
Click to Download | DTSC review of revised corrective measures implementation/remedial design work plan for the groundwater remediation at Pacific Gas and Electric Company (PG&E), Topock Compressor Station, Needles, California (EPA ID No. CAT080011729) | October 27, 2011 | 39.24 KB |
![]() |
Click to Download | DTSC Comments on the May 2011 Groundwater CMI/RD Work Plan for SWMU 1/AOC 1 and AOC 10, PG&E Topock Compressor Station, Needles, California | June 17, 2011 | 248.35 KB |
![]() |
Click to Download | Federal Comments on the Draft Corrective Measures Study/Feasibility Study Report for Chromium in Groundwater at the PG&E, Topock Compressor Station, Needles, California | June 17, 2011 | 104.66 KB |
![]() |
Click to Download | Fort Mojave Indian Tribe Comments on May 2, 2011, Document Titled, Groundwater Corrective Measure Implementation/Remedial Design Work Plan for SWMU1/AOC1 and AOC10, PG&E Topock Compressor Station, Needles, California (Document ID: PGE20110502A) | June 10, 2011 | 215.09 KB |
![]() |
Click to Download | Hualapai Comments on May 2011 Groundwater CMI/RD Work Plan: Design of Groundwater Remedy—An Opportunity to Prevent Further Damages to Cultural Resources near the PG&E Topock Compressor Station, Needles, California | June 6, 2011 | 452.63 KB |
![]() |
Click to Download | ADEQ Comments on Groundwater Corrective Measure Implementation/Remedial Design Work Plan for SWMU VAOC 1 and AOC 10, PG&E Topock Compressor Stations, Needles, California, Site Code: 506252-01 | June 3, 2011 | 107.05 KB |
![]() |
Click to Download | Metropolitan Water District of Southern California (Metropolitan) comments on the Draft Corrective Measures Implementation (CMl)/Remedial Design (RD) Work Plan (WP), PG&E Topock Compressor Station, Needles, California | June 3, 2011 | 154.76 KB |
![]() |
Click to Download | Groundwater Corrective Measures Implementation/ Remedial Design Work Plan for SWMU 1/AOC 1 and AOC 10, PG&E Topock Compressor Station, Needles, California | May 2, 2011 | 2.49 MB |