Click on the boxes in the flow-chart below to view documents from each phase of the process.
Important Notice Accessibility of Older Documents Expires After December 30, 2020
All documents published before January 1, 2020 will no longer be accessible on this website after December 30, 2020. After December 30, 2020 all older documents can be accessed through the project repositories or by direct request to California Department of Toxic Substances Control.
IM-3 Injection Area Characterization
Type | Download | Document Name | Publish Date | Size |
---|---|---|---|---|
![]() |
Click to Download | Proposed Modifications to the Groundwater Monitoring Plan for Interim Measures No. 3 Injection Area Compliance Monitoring Program, PG&E Topock Compressor Station, Needles, California | July 3, 2008 | 971.63 KB |
![]() |
Click to Download | Groundwater and Hydrogeologic Investigation Report for Interim Measures No. 3 Injection Area | June 22, 2005 | 14.7 MB |
![]() |
Click to Download | Baseline Groundwater Quality Technical Memorandum for the IM3 Injection Area | June 10, 2005 | 693.06 KB |
![]() |
Click to Download | Groundwater Elevation Maps for IM No. 3 Injection Area | June 10, 2005 | 1.48 MB |