Click on the boxes in the flow-chart below to view documents from each phase of the process.

IM-3 Treatment System Construction

Type Download Document Name Publish Date Size
Click to Download Notice of Termination WDID No. 736C329173 NPDES General Permit No. CAS000002 Interim Measure No. 2 June 27, 2006 2.22 MB
Click to Download Installation Report for Extraction Well TW-3D December 29, 2005 2.29 MB
Click to Download Interim Measures No. 3 Treatment and Extraction System - Construction Completion Report October 18, 2005 5.74 MB
Click to Download Groundwater Extraction Well PE-1 Installation Report May 2, 2005 6.58 MB
Click to Download Interim Measures Phase 2 Monitoring Well Installation Report May 2, 2005 11 MB