Interim Measures

  • View of the IM-3 treatment plant looking south
  • Workers connect drop pipe during installation of new pump at extraction well PE-01, March 2012.
  • Installation of the new pump at PE-1, March 2012
  • Work done to Replace the pump at extraction well PE-1, March 2012. Photograph of new pump prior to installation
  • Work done to Replace the pump at extraction well PE-1, March 2012
  • Work done to Replace the pump at extraction well PE-1, March 2012.
  • Current Topock Site photograph looking south/southeast towards IM-3 Treatment Plant (2013)
  • View of the MW-20 bench during IM-2 groundwater extraction activities, May 2004
  • Current Topock Site photograph looking north towards IM-3 Treatment Plant (2013)
  • IM-1: Installation of MW-36 floodplain wells, April 2004
  • Logging core samples from IM-1 well drilling
  • IM-1: Installation of floodplain monitoring wells, March - May 2004
  • IM-2: Protective berms and ground liners at the MW-20 bench
  • MW-20-100 monitoring well with old extraction and containment system, 2004
  • View of the MW-20 bench during IM-2 groundwater extraction activities, January 2005
  • Braced framework of the Storage Tank foundation, November 2004
  • IM-3 batch treatment chemical containers at the MW-20 bench in 2004.
  • Groundwater extraction from the MW-20 monitoring wells, March 2004
  • IM-2 water transport trucks arrive and depart from MW-20 bench, circa 2004-2005
  • Setting T-700 (treated water storage tank) at the IM-3 treatment plant, January 2005
  • Setting tanks T-100 (raw water storage) and T-700 (treated water storage) at the IM-3 treatment plant, January 2005
  • View of the IM-3 Treatment Facility from the Topock Compressor Station
  • Construction of the Topock IM-3 Treatment Plant, January 28, 2005
  • View from South toward the IM-3 Treatment Facility, February 2006
  • Construction of the Topock IM-3 Treatment Plant, January 19, 2005
  • Construction of the Topock IM-3 Treatment Plant, December 17, 2004
  • IM-3 Treatment Facility after construction activities are completed, circa 2006
  • Construction of the Topock IM-3 Treatment Plant, July 2005
  • Construction of the Topock IM-3 Treatment Plant, April 2005
  • Construction of the Topock IM-3 Treatment Plant, March 9, 2005
  • Construction of the Topock IM-3 Treatment Plant, March 21, 2005
  • Construction of the Topock IM-3 Treatment Plant, February 2005
  • Construction of the Topock IM-3 Treatment Plant, December 11, 2004
  • Construction of the IM-3 Treatment Plan, January 2005
  • Water level monitoring during testing at injection well #3, date unknown
  • Preparing to install injection well #3 casing
  • Drilling of injection well #3 at night
  • Compliance well installation in the injection well field
  • Drilling a Compliance well.
  • Placing Sand Cover on Electrical Conduits, December 2004
  • HDPE Pipe Installation: Laying the pipe after fusing sections together
  • Two HDPE fusion machines working in tandem fusing 40-ft sections of 4'x8' double wall pipe, November 2004

Difficulty Accessing Material?

If you have a disability and have difficulty accessing material on this site please contact us in writing, via email or via telephone and we will work with you to make the information available. Please indicate the nature of the accessibility need, your preferred format (Braille, large print, etc.), what material you are trying to access including where it's located on this site, and how to reach you if questions arise while fulfilling your request. You can direct your requests to:

 

Written Requests

The Office of Civil Rights
Department of Toxic Substances Control
P.O. Box 806
Sacramento, CA 95812-0806

Email Requests

accessibility@dtsc.ca.gov

Telephone Requests

+1 916 324-3095
 
+1 800 728-6942 - Toll Free