Appendix BOD

Final Design
Mime type Download Document Name Publish Date Size
Click to Download Addendum to Development of Groundwater Flow and Solute Transport Models Appendices A and B, PG&E Topock Compressor Station, Needles, California January 9, 2017 346.42 KB
Click to Download Addendum to Development of Groundwater Flow and Solute Transport Models Figures, PG&E Topock Compressor Station, Needles, California January 9, 2017 82.74 MB
Click to Download Addendum to Development of Groundwater Flow and Solute Transport Models Text, PG&E Topock Compressor Station, Needles, California January 9, 2017 593.46 KB
Click to Download Supplemental and Errata Information for the Final (100%) Design for the Final Groundwater Remedy November 18, 2016 104.65 MB
Click to Download Updated Final Basis of Design Report - Appendix B Development of Groundwater Flow and Solute Transport Models February 29, 2016 62.29 MB
Click to Download Master Comprehensive Table of Contents for the Final (100%) Submittal Final Basis of Design Report for the Final Groundwater Remedy, PG&E Topock Compressor Station, Needles, California December 9, 2015 504 KB
Click to Download Final Basis of Design Report - Main Text November 18, 2015 66.97 MB
Click to Download Final Basis of Design Report - Appendix A Analytical Data November 18, 2015 173.07 MB
Click to Download Final Basis of Design Report - Appendix A1 Analytical Data November 18, 2015 10.07 MB
Click to Download Final Basis of Design Report - Appendix B Development Groundwater Models November 18, 2015 73.56 MB
Click to Download Final Basis of Design Report - Appendix C Design Criteria November 18, 2015 97.65 MB
Click to Download Final Basis of Design Report - Appendix D1 Plans and Equipment Lists November 18, 2015 1.13 MB
Click to Download Final Basis of Design Report - Appendix D2 Plans Drawings Part 1/2 November 18, 2015 110.63 MB
Click to Download Final Basis of Design Report - Appendix D2 Plans Drawings Part 2/2 November 18, 2015 233.03 MB
Click to Download Final Basis of Design Report - Appendixes E, F, G, J, K, M and N November 18, 2015 112.05 MB
Click to Download Final Basis of Design Report - Appendix H Final Cost Estimate December 4, 2015 2.4 MB
Click to Download Final Basis of Design Report - Section 8 December 4, 2015 138.12 KB
Click to Download Final Basis of Design Report - Appendix I Response to Comments November 18, 2015 112.62 MB
Click to Download Final Basis of Design Report - Appendix L Operation and Maintenance Manual November 18, 2015 155.39 MB
Click to Download Final Basis of Design Report Construction/Remedial Action Work Plan - Main Text, Appendixes A, B, C, D, E, J, K, M - W November 18, 2015 128.83 MB
Click to Download Final Basis of Design Report Construction/Remedial Action Work Plan - Appendix E Final Cost Estimate December 4, 2015 2.4 MB
Click to Download Final Basis of Design Report Construction/Remedial Action Work Plan - Appendix F Interim Measures 3 Decommission Work Plan November 18, 2015 98.69 MB
Click to Download Final Basis of Design Report Construction/Remedial Action Work Plan - Appendixes G and H November 18, 2015 147.36 MB
Click to Download Final Basis of Design Report Construction/Remedial Action Work Plan - Appendix I Cultural Historic Properties Management Plan November 18, 2015 6.02 MB
Click to Download Final Basis of Design Report Construction/Remedial Action Work Plan - Appendix L Soil Management Plan November 18, 2015 59.38 MB
Click to Download Final Basis of Design Report Construction/Remedial Action Work Plan - Appendix X Response to Comments November 18, 2015 46.52 MB