Click on the boxes in the flow-chart below to view documents from each phase of the process.

Arizona Groundwater Investigation

Type Download Document Name Publish Date Size
Click to Download Installation Report for Wells on the Arizona Shore of the Colorado River at the PG&E Topock Compressor Station, Needles, California August 12, 2008 3.26 MB
Click to Download Installation Report (with Appendices) for Wells on the Arizona Shore of the Colorado River at the PG&E Topock Compressor Station, Needles, California August 12, 2008 13.59 MB
Click to Download Work Plan for Well Installation and Groundwater Characterization on Arizona Shore of the Colorado River at Topock, Arizona January 16, 2007 9.85 MB