|
Click to Download |
Appendix B - Third Quarter 2017 Interim Measures Performance and Site-Wide Groundwater and Surface Water Monitoring Report |
December 15, 2017 |
44.73 MB |
|
Click to Download |
Third Quarter 2017 Interim Measures Performance Monitoring and Site-Wide Groundwater and Surface Water Monitoring Report |
December 15, 2017 |
20.72 MB |
|
Click to Download |
Appendix B - Second Quarter 2017 Interim Measures Performance and Site-Wide Groundwater and Surface Water Monitoring Report |
August 15, 2017 |
45.01 MB |
|
Click to Download |
Second Quarter 2017 Interim Measures Performance Monitoring and Site-Wide Groundwater and Surface Water Monitoring Report |
August 15, 2017 |
19.39 MB |
|
Click to Download |
Appendix B - First Quarter 2017 Interim Measures Performance and Site-Wide Groundwater and Surface Water Monitoring Report |
April 26, 2017 |
68.08 MB |
|
Click to Download |
First Quarter 2017 Interim Measures Performance Monitoring and Site-Wide Groundwater and Surface Water Monitoring Report |
April 26, 2017 |
18.78 MB |
|
Click to Download |
Appendix B - Fourth Quarter 2016 Interim Measures Performance and Site-Wide Groundwater and Surface Water Monitoring Report |
March 15, 2017 |
153.57 MB |
|
Click to Download |
Fourth Quarter 2016 and Annual Interim Measures Performance Monitoring and Site-Wide Groundwater and Surface Water Monitoring Report |
March 15, 2017 |
17.77 MB |
|
Click to Download |
Appendix B - Third Quarter 2016 Interim Measures Performance and Site-Wide Groundwater and Surface Water Monitoring Report |
December 15, 2016 |
33.66 MB |
|
Click to Download |
Third Quarter 2016 Interim Measures Performance Monitoring and Site‐Wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
December 15, 2016 |
9.44 MB |
|
Click to Download |
Appendix B - Second Quarter 2016 Interim Measures Performance and Site-Wide Groundwater and Surface Water Monitoring Report |
August 15, 2016 |
66.13 MB |
|
Click to Download |
Second Quarter 2016 Interim Measures Performance Monitoring and Site‐Wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
August 15, 2016 |
9.82 MB |
|
Click to Download |
Appendix B - First Quarter 2016 Interim Measures Performance and Site-Wide Groundwater and Surface Water Monitoring Report |
April 29, 2016 |
75.1 MB |
|
Click to Download |
First Quarter 2016 Interim Measures Performance Monitoring and Site‐Wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
April 29, 2016 |
11.33 MB |
|
Click to Download |
Appendix B - Fourth Quarter 2015 Interim Measures Performance and Site-Wide Groundwater and Surface Water Monitoring Report |
March 15, 2016 |
139.09 MB |
|
Click to Download |
Fourth Quarter 2015 and Annual Interim Measures Performance Monitoring and Site‐Wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
March 15, 2016 |
17.55 MB |
|
Click to Download |
Third Quarter 2015 Interim Measures Performance Monitoring and Site‐wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
December 15, 2015 |
10.67 MB |
|
Click to Download |
Second Quarter 2015 Interim Measures Performance Monitoring and Site‐wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
August 14, 2015 |
44.57 MB |
|
Click to Download |
First Quarter 2015 Interim Measures Performance Monitoring and Site‐wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
April 30, 2015 |
11.33 MB |
|
Click to Download |
Fourth Quarter 2014 and Annual Interim Measures Performance and Site-Wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
March 13, 2015 |
59.1 MB |
|
Click to Download |
Third Quarter 2014 Interim Measures Performance and Site-Wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
December 15, 2014 |
11.24 MB |
|
Click to Download |
Second Quarter 2014 Interim Measures Performance Monitoring and Site‐wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
August 15, 2014 |
21.28 MB |
|
Click to Download |
First Quarter 2014 Interim Measures Performance Monitoring and Site‐wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
April 30, 2014 |
26.98 MB |
|
Click to Download |
Fourth Quarter 2013 and Annual Interim Measures Performance and Site-Wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
March 14, 2014 |
56.91 MB |
|
Click to Download |
Third Quarter 2013 Interim Measures Performance Monitoring and Site‐wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
November 29, 2013 |
23.63 MB |
|
Click to Download |
Second Quarter 2013 Interim Measures Performance and Site-Wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
August 15, 2013 |
28.95 MB |
|
Click to Download |
First Quarter 2013 Interim Measures Performance and Site-Wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
May 15, 2013 |
36.57 MB |
|
Click to Download |
Fourth Quarter 2012 and Annual Interim Measures Performance and Site-Wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
March 15, 2013 |
62.49 MB |
|
Click to Download |
Third Quarter 2012 Interim Measures Performance and Site-Wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
November 30, 2012 |
30.72 MB |
|
Click to Download |
Second Quarter 2012 Interim Measures Performance and Site-Wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
August 15, 2012 |
45.83 MB |
|
Click to Download |
First Quarter 2012 Interim Measures Performance and Site-Wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
April 30, 2012 |
31.19 MB |
|
Click to Download |
Fourth Quarter 2011 and Annual Interim Measures Performance and Site-Wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
March 15, 2012 |
38.65 MB |
|
Click to Download |
Third Quarter 2011 Interim Measures Performance Monitoring and Site- Wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
November 30, 2011 |
22.26 MB |
|
Click to Download |
Second Quarter 2011 Interim Measures Performance Monitoring and Site-Wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
August 15, 2011 |
20.13 MB |
|
Click to Download |
First Quarter 2011 Interim Measures Performance Monitoring and Site-Wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station Needles, California |
April 29, 2011 |
19.53 MB |
|
Click to Download |
Fourth Quarter 2010 and Annual Interim Measures Performance Monitoring and Site Wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station Needles, California |
March 15, 2011 |
11.47 MB |
|
Click to Download |
Third Quarter 2010 Interim Measures Performance Monitoring and Site-Wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station Needles, California |
November 30, 2010 |
17.01 MB |
|
Click to Download |
Second Quarter 2010 Interim Measures Performance Monitoring and Site-Wide Groundwater Monitoring Report, PG&E Topock Compressor Station, Needles, California |
August 30, 2010 |
9.07 MB |
|
Click to Download |
First Quarter 2010 Interim Measures Performance Monitoring and Site-Wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station Needles, California |
May 30, 2010 |
17.28 MB |
|
Click to Download |
Fourth Quarter 2009 and Annual Interim Measures Performance Monitoring and Site-Wide Groundwater and Surface Water Monitoring Report |
March 15, 2010 |
29.86 MB |
|
Click to Download |
Third Quarter 2009 IM Performance Monitoring and Site-Wide Groundwater and Surface Water Monitoring Report, PG&E Topock Compressor Station, Needles, California |
November 30, 2009 |
5.79 MB |
|
Click to Download |
Interim Measure No. 3 Groundwater Treatment System/Extraction System 20 Percent Downtime in September 2009 Report, PG&E Topock Compressor Station |
October 19, 2009 |
221.41 KB |
|
Click to Download |
Second Quarter 2009 Interim Measures Performance Monitoring and Site-Wide Groundwater and Surface Water Monitoring Report PG&E Topock Compressor Station, Needles, California |
August 28, 2009 |
5.21 MB |
|
Click to Download |
Interim Measure No. 3 Groundwater Treatment System/Extraction System 20 Percent Downtime in July 2009 Report PG&E, Topock Compressor Station |
August 19, 2009 |
93.94 KB |
|
Click to Download |
First Quarter 2009, Quarterly Performance Monitoring Report and Evaluation, February through April 2009, PG&E Topock Compressor Station, Needles, California |
May 29, 2009 |
4.28 MB |
|
Click to Download |
Performance Monitoring Report for Fourth Quarter 2008 and Annual Performance Evaluation, February 2008 through January 2009, Interim Measures Performance Monitoring Program, PG&E Topock Compressor Station, Needles, California |
March 13, 2009 |
9.52 MB |
|
Click to Download |
Third Quarter 2008 Performance Monitoring Report, Interim Measures Performance Monitoring Program, PG&E Topock Compressor Station, Needles, California |
December 1, 2008 |
4.57 MB |
|
Click to Download |
Second Quarter 2008 Performance Monitoring Report, Interim Measures Performance Monitoring Program, PG&E Topock Compressor Station, Needles, California |
August 29, 2008 |
4.13 MB |
|
Click to Download |
Board Order R7-2006-0060; Interim Measure No. 3 Groundwater Treatment System Discharge to Injection Wells July 2008 Monitoring Report, PG&E Topock Compressor Station, Needles, California |
July 15, 2008 |
3.52 MB |
|
Click to Download |
First Quarter 2008 Performance Monitoring Report Interim Measures Performance Monitoring Program PG&E Topock Compressor Station, Needles, California |
May 30, 2008 |
4 MB |
|
Click to Download |
Performance Monitoring Report for Fourth Quarter 2007 and Annual Performance Evaluation, February 2007 through January 2007 |
March 14, 2008 |
9.22 MB |
|
Click to Download |
Baseline Soil Sampling at the PE-1 Pipeline, Interim Measure No.3 at Pacific Gas and Electric Company, Topock Compressor Station, Needles, California |
February 5, 2008 |
2.54 MB |
|
Click to Download |
Third Quarter 2007 Performance Monitoring Report, Interim Measures Performance Monitoring Program, PG&E Topock Compressor Station, Needles, California |
November 30, 2007 |
4.61 MB |
|
Click to Download |
Performance Monitoring Report Second Quarter 2007 |
August 30, 2007 |
4.55 MB |
|
Click to Download |
Performance Monitoring Report June 2007 |
July 20, 2007 |
3.29 MB |
|
Click to Download |
Performance Monitoring Report May 2007 |
June 20, 2007 |
3.4 MB |
|
Click to Download |
Performance Monitoring Report April 2007 and First Quarter 2007 |
May 30, 2007 |
3.52 MB |
|
Click to Download |
Performance Monitoring Report March 2007 |
April 20, 2007 |
3.13 MB |
|
Click to Download |
Fourth Quarter and 2006 Annual Performance Monitoring Evaluation |
April 6, 2007 |
5.97 MB |
|
Click to Download |
Performance Monitoring Report February 2007 |
March 15, 2007 |
2.77 MB |
|
Click to Download |
Performance Monitoring Report January 2007 |
February 15, 2007 |
3.62 MB |
|
Click to Download |
Performance Monitoring Report December 2006 |
January 15, 2007 |
3.72 MB |
|
Click to Download |
Performance Monitoring Results November 2006 |
December 15, 2006 |
3.99 MB |
|
Click to Download |
Performance Monitoring Report for October 2006 and Third Quarter 2006 |
November 30, 2006 |
4.55 MB |
|
Click to Download |
Performance Monitoring Report September 2006 |
October 13, 2006 |
3.29 MB |
|
Click to Download |
Performance Monitoring Report August 2006 |
September 15, 2006 |
3.95 MB |
|
Click to Download |
Performance Monitoring Report for July 2006 and Second Quarter 2006 |
August 30, 2006 |
5.14 MB |
|
Click to Download |
Topock IM Performance Monitoring Contingency Plan, Revision 1 |
August 28, 2006 |
363.65 KB |
|
Click to Download |
Technical Memorandum - Proposal for Modifying Hydraulic Data Collection for the IM Performance Monitoring Program |
August 23, 2006 |
449.57 KB |
|
Click to Download |
Performance Monitoring Report June 2006 |
July 14, 2006 |
3.5 MB |
|
Click to Download |
Interim Measures 2006 Well Drilling Investigation Report |
June 30, 2006 |
2.93 MB |
|
Click to Download |
Performance Monitoring Report for May 2006 Interim Measures Performance Monitoring Program |
June 21, 2006 |
4.41 MB |
|
Click to Download |
First Quarter 2006 (and April 2006) Performance Monitoring Report Interim Measures Performance Monitoring Program |
May 30, 2006 |
6.77 MB |
|
Click to Download |
Performance Monitoring Report for March 2006 Interim Measures Performance Monitoring Program |
April 14, 2006 |
2.87 MB |
|
Click to Download |
Technical Memorandum Well Condition Observations and Video Log Inspection of Groundwater Monitoring Well MW-44-125 |
April 14, 2006 |
1.08 MB |
|
Click to Download |
Performance Monitoring Report for February 2006 Interim Measures Performance Monitoring Program |
March 14, 2006 |
3.77 MB |
|
Click to Download |
Performance Monitoring Report for January 2006 Interim Measures Performance Monitoring Program |
February 15, 2006 |
3.77 MB |
|
Click to Download |
Technical Addendum No. 2 Well Installation Work Plan for Interim Measures Performance Monitoring Program |
February 7, 2006 |
4 MB |
|
Click to Download |
Technical Addendum No. 1 Well Installation Work Plan for Interim Measures Performance Monitoring Program |
January 27, 2006 |
2.57 MB |
|
Click to Download |
Performance Monitoring Report for December 2005 Interim Measures Performance Monitoring Program |
January 13, 2006 |
3.62 MB |
|
Click to Download |
Performance Monitoring Report for November 2005 |
December 15, 2005 |
3.29 MB |
|
Click to Download |
Performance Monitoring Report for Third Quarter 2005 (and October 2005) |
November 30, 2005 |
5.11 MB |
|
Click to Download |
Performance Monitoring Report for September 2005 |
October 14, 2005 |
3.39 MB |
|
Click to Download |
Performance Monitoring Report for August 2005 |
September 15, 2005 |
3.55 MB |
|
Click to Download |
Performance Monitoring Report for Second Quarter 2005 |
August 30, 2005 |
4.71 MB |
|
Click to Download |
Numerical Groundwater Flow Model Simulation of Interim Measures Extraction (Copy) |
July 15, 2005 |
2.44 MB |
|
Click to Download |
Draft Performance Monitoring Plan for Floodplain Area |
April 15, 2005 |
3.53 MB |