Click on the boxes in the flow-chart below to view documents from each phase of the process.

Background Study

Type Download Document Name Publish Date Size
Click to Download Final Groundwater Background Study, Steps 3 and 4: Revised Final Report of Results - Text, Tables, Figures and Appendices A, C - F November 6, 2009 4.53 MB
Click to Download Groundwater Background Study, Steps 3 and 4: Revised Final Report of Results, PG&E Topock Compressor Station, Needles, California November 6, 2009 4.09 MB
Click to Download Preliminary Evaluation of Data for the Groundwater Background Study September 14, 2006 4.66 MB
Click to Download Background Study, Step 2 Results September 23, 2005 4.85 MB
Click to Download Background Study, Step 1 Results March 10, 2005 24.84 MB
Click to Download Background Study - Draft Work Plan: Assessing Background Metals Concentrations in Groundwater June 30, 2004 3.48 MB