Click on the boxes in the flow-chart below to view documents from each phase of the process.
Important Notice Accessibility of Older Documents Expires After December 30, 2020
All documents published before January 1, 2020 will no longer be accessible on this website after December 30, 2020. After December 30, 2020 all older documents can be accessed through the project repositories or by direct request to California Department of Toxic Substances Control.
Floodplain
Type | Download | Document Name | Publish Date | Size |
---|---|---|---|---|
![]() |
Click to Download | 2014 Annual Monitoring Report for the Floodplain Reductive Zone In-Situ Pilot Test, PG&E Topock Compressor Station, Needles, California | November 19, 2014 | 2.85 MB |
![]() |
Click to Download | 2013 Annual Monitoring Reportforthe Floodplain Reductive Zone In‐Situ Pilot Test | October 11, 2013 | 2.41 MB |
![]() |
Click to Download | 2012 Annual Monitoring Report for the Floodplain Reductive Zone In-Situ Pilot Test, PG&E Topock Compressor Station, Needles, California | November 6, 2012 | 2.29 MB |
![]() |
Click to Download | 2011 Annual Monitoring Report for the Floodplain Reductive Zone In-Situ Pilot Test, PG&E Topock Compressor Station, Needles, California | October 4, 2011 | 4.12 MB |
![]() |
Click to Download | 2010 Annual Monitoring Report for the Floodplain Reductive Zone In‐Situ Pilot Test, PG&E Topock Compressor Station Needles, California | October 19, 2010 | 2.8 MB |
![]() |
Click to Download | Third Quarter 2009 Monitoring Report for the Floodplain Reductive Zone In-Situ Pilot Test, PG&E Topock Compressor Station Environmental Investigation and Cleanup Project, Needles, California | November 16, 2009 | 7.48 MB |
![]() |
Click to Download | Second Quarter 2009 Monitoring Report for the Floodplain Reductive Zone In-Situ Pilot Test, PG&E Topock Compressor Station Environmental Investigation and Cleanup Project, Needles, California | July 15, 2009 | 1.39 MB |
![]() |
Click to Download | First Quarter 2009 Monitoring Report for the Floodplain Reductive Zone In-Situ Pilot Test, PG&E Topock Compressor Station, Needles, California | April 15, 2009 | 1.64 MB |
![]() |
Click to Download | Third Quarter 2008 Monitoring Report for the Floodplain Reductive Zone In-Situ Pilot Test, PG&E Topock Compressor Station, Needles, California | October 15, 2008 | 1.61 MB |
![]() |
Click to Download | Board Order R7-2006-0008 and R7-2007-0014 Floodplain Reductive Zone In Situ Pilot Test Second Quarter 2008 Monitoring Report, PG&E Topock Compressor Station, Needles, California | July 15, 2008 | 1.44 MB |
![]() |
Click to Download | Floodplain Reductive Zone In-Situ Pilot Test Final Completion Report | March 5, 2008 | 8.17 MB |
![]() |
Click to Download | December 2007 and Fourth Quarter 2007 Monitoring Report for the Floodplain Reductive Zone In-Situ Pilot Test | January 15, 2008 | 1.69 MB |
![]() |
Click to Download | Board Order R7-2006-0008 and R7-2007-0014, PG&E Topock Compressor Station, Needles, California, Floodplain Reductive Zone In Situ Pilot Test, November 2007 Monitoring Report | December 14, 2007 | 1.52 MB |
![]() |
Click to Download | Board Order R7-2006-0008 and R7-2007-0014, PG&E Topock Compressor Station, Needles, California, Floodplain Reductive Zone In Situ Pilot Test, October 2007 Monitoring Report | November 15, 2007 | 1.66 MB |
![]() |
Click to Download | Arcadis R7-2006-0008 and R7-2007-0014 Floodplain In-Situ Pilot Test Report for August 2007 | September 14, 2007 | 5.59 MB |
![]() |
Click to Download | Arcadis R7-2006-0008 and R7-2007-0014 Floodplain In-Situ Pilot Test Report for July 2007 | August 15, 2007 | 3.44 MB |
![]() |
Click to Download | Arcadis R7-2006-0008 and R7-2007-0014 Floodplain In-Situ Pilot Test Report for June 2007 | July 13, 2007 | 4.23 MB |
![]() |
Click to Download | Request for Reduction of Required Parameter Analysis at the Floodplain Reductive Zone In Situ Pilot Test for Board Order R7-2006-0008 | June 18, 2007 | 999.04 KB |
![]() |
Click to Download | Arcadis R7-2006-0008 and R7-2007-0014 Floodplain In-Situ Pilot Test Report for May 2007 | June 15, 2007 | 4.4 MB |
![]() |
Click to Download | Arcadis R7-2006-0008 Floodplain In-Situ Pilot Test Report for April 2007 | May 15, 2007 | 3.16 MB |
![]() |
Click to Download | Arcadis R7-2006-0008 Floodplain In-Situ Pilot Test Report for March 2007 | April 13, 2007 | 3.08 MB |
![]() |
Click to Download | Arcadis R7-2006-0008 Floodplain In-situ Pilot Test Report for Feb 2007 | March 15, 2007 | 3.25 MB |
![]() |
Click to Download | Arcadis R7-2006-0008 Floodplain In-situ Pilot Test Report for Jan 2007 | February 15, 2007 | 2.76 MB |
![]() |
Click to Download | Arcadis R7-2006-0008 Floodplain In-situ Pilot Test Report for Dec 2006 | January 15, 2007 | 3.6 MB |
![]() |
Click to Download | Arcadis R7-2006-0008 Floodplain In-situ Pilot Test Report for Nov 2006 | December 15, 2006 | 1.37 MB |
![]() |
Click to Download | Arcadis R7-2006-0008 Floodplain In-situ Pilot Test Addendum 3 to Work Plan | November 30, 2006 | 1.06 MB |
![]() |
Click to Download | Arcadis R7-2006-0008 Floodplain In-situ Pilot Test Report for Oct 2006 | November 15, 2006 | 1.54 MB |
![]() |
Click to Download | Supplemental Letter Request to HNWR for Approval of Upland In-situ Pilot Test re: PGE-6, PGE-7, PGE-8 and MW-48 Activities | November 15, 2006 | 252.72 KB |
![]() |
Click to Download | Arcadis R7-2006-0008 Floodplain In-situ Pilot Test Report for Sept 2006 - Revised Cover Letter | October 30, 2006 | 239.39 KB |
![]() |
Click to Download | Arcadis R7-2006-0008 Floodplain In-situ Pilot Test Report for Sept 2006 | October 13, 2006 | 1.34 MB |
![]() |
Click to Download | August 2006 Monitoring Report for the Floodplain Reductive Zone In-situ Pilot Test | September 15, 2006 | 1.51 MB |
![]() |
Click to Download | July 2006 Monitoring Report for the Floodplain Reductive Zone In-situ Pilot Test | August 15, 2006 | 1.31 MB |
![]() |
Click to Download | 60-Day Status Report Floodplain Reductive Zone In-situ Pilot Test | August 1, 2006 | 1.56 MB |
![]() |
Click to Download | Request for Approval of 2nd and 3rd Injection Events, Floodplain Reductive Zone In-situ Pilot Test | July 25, 2006 | 855.72 KB |
![]() |
Click to Download | June 2006 Monitoring Report for the Floodplain Reductive Zone In-situ Pilot Test | July 14, 2006 | 1.5 MB |
![]() |
Click to Download | May 2006 Monitoring Report for the Floodplain Reductive Zone In-Situ Pilot Test, Waste Discharge Requirements, Order No. R7-2006-0008 | June 15, 2006 | 1.08 MB |
![]() |
Click to Download | April 2006 Monitoring Report for the Floodplain Reductive Zone In-Situ Pilot Test, Waste Discharge Requirements, Order No. R7-2006-0008 | May 15, 2006 | 1.12 MB |
![]() |
Click to Download | Contingency Plan Floodplain Reductive Zone, In Situ Pilot Test Board Order R7-2006-0008 | April 24, 2006 | 270.42 KB |
![]() |
Click to Download | March 2006 and First Quarter 2006 Monitoring Reports for the Floodplain Reductive Zone In-Situ Pilot Test, Waste Discharge Requirements, Order No. R7-2006-0008 | April 15, 2006 | 6.2 MB |
![]() |
Click to Download | Addendum 2 to the In-Situ Hexavalent Chromium Reduction Pilot Test Work Plan - Floodplain Reductive Zone Enhancement | April 14, 2006 | 97.02 KB |
![]() |
Click to Download | Notice of Determination for In-situ Hexavalent Chromium Reduction Pilot Test Work Plan -- Floodplain Reductive Zone Enhancement | December 12, 2005 | 266.36 KB |
![]() |
Click to Download | Final Addendum to the In-situ Hexavalent Chromium Reduction Pilot Test Work Plan -- Flood Reductive Zone Enhancement | December 8, 2005 | 329.6 KB |
![]() |
Click to Download | Biological Assessment - PE-1 Pipeline and Floodplain In-situ Area | November 4, 2005 | 4.99 MB |
![]() |
Click to Download | Draft Negative Declaration for In-situ Hexavalent Chromium Reduction Pilot Test Work Plan -- Floodplain Reductive Zone Enhancement | October 19, 2005 | 77.81 KB |
![]() |
Click to Download | In-situ Public Notice - Floodplain Area (Copy) | October 19, 2005 | 22.8 KB |
![]() |
Click to Download | Draft Negative Declaration - Floodplain Area (Copy) | October 14, 2005 | 20.38 KB |
![]() |
Click to Download | In-Situ Hexavalent Chromium Reduction Pilot Test Work Plan--Floodplain Reductive Zone Enhancement | August 8, 2005 | 2.58 MB |
![]() |
Click to Download | Initial Study - Floodplain Area (Copy) | November 21, 2003 | 773.18 KB |