Click on the boxes in the flow-chart below to view documents from each phase of the process.
Important Notice Accessibility of Older Documents Expires After December 30, 2020
All documents published before January 1, 2020 will no longer be accessible on this website after December 30, 2020. After December 30, 2020 all older documents can be accessed through the project repositories or by direct request to California Department of Toxic Substances Control.
Other Documents
Type | Download | Document Name | Publish Date | Size |
---|---|---|---|---|
![]() |
Click to Download | Final Corrective Measures/Feasibility Study Work Plan | March 6, 2008 | 2.42 MB |
![]() |
Click to Download | Responses to Agency and Stakeholder Comments on the Corrective Measures/Feasibility Study Work Plan | October 5, 2007 | 241.95 KB |
![]() |
Click to Download | Corrective Measures / Feasibility Study Work Plan | June 29, 2007 | 2.31 MB |
![]() |
Click to Download | DTSC CMS Work Plan Comments | May 15, 2007 | 83.85 KB |
![]() |
Click to Download | Tech Memo: Preliminary Concepts for Soil-Bentonite Cutoff Wall | April 14, 2004 | 299.96 KB |