Chromium Isotope Study

Type Download Document Name Publish Date Size
Click to Download Chromium Isotope Study Summary Report, PG&E Topock Compressor Station, Needles, California May 20, 2008 2.77 MB
Click to Download Phase II Chromium Isotope Study Work Plan PG&E Topock Compressor Station April 6, 2007 850.03 KB
Click to Download Revised Chromium Isotope Study Workplan April 7, 2006 1.39 MB
Click to Download Chromium Isotope Study Workplan March 3, 2006 2.34 MB

Difficulty Accessing Material?

If you have a disability and have difficulty accessing material on this site please contact us in writing, via email or via telephone and we will work with you to make the information available. Please indicate the nature of the accessibility need, your preferred format (Braille, large print, etc.), what material you are trying to access including where it's located on this site, and how to reach you if questions arise while fulfilling your request. You can direct your requests to:

 

Written Requests

The Office of Civil Rights
Department of Toxic Substances Control
P.O. Box 806
Sacramento, CA 95812-0806

Email Requests

accessibility@dtsc.ca.gov

Telephone Requests

+1 916 324-3095
 
+1 800 728-6942 - Toll Free