Click on the boxes in the flow-chart below to view documents from each phase of the process.
Important Notice Accessibility of Older Documents Expires After December 30, 2020
All documents published before January 1, 2020 will no longer be accessible on this website after December 30, 2020. After December 30, 2020 all older documents can be accessed through the project repositories or by direct request to California Department of Toxic Substances Control.
Arizona Groundwater Investigation
Type | Download | Document Name | Publish Date | Size |
---|---|---|---|---|
![]() |
Click to Download | Installation Report for Wells on the Arizona Shore of the Colorado River at the PG&E Topock Compressor Station, Needles, California | August 12, 2008 | 3.26 MB |
![]() |
Click to Download | Installation Report (with Appendices) for Wells on the Arizona Shore of the Colorado River at the PG&E Topock Compressor Station, Needles, California | August 12, 2008 | 13.59 MB |
![]() |
Click to Download | Work Plan for Well Installation and Groundwater Characterization on Arizona Shore of the Colorado River at Topock, Arizona | January 16, 2007 | 9.85 MB |